|HOME |ABOUT |ARTICLES |ACK |FEEDBACK |TOC |LINKS |BLOG |JOBS |


Tutorials



SYNCHRONIZING WITH THE SIMULATOR



To synchronize Specman Elite with a simulator, we need to define callbacks.

Start of callback: When the simulator pauses and gives control to Specman Elite.
Pauses are triggered by @sim events in e.

End of callback: When Specman Elite pauses and gives control back to the simulator.
Pauses are caused by wait/sync actions in e.


The @sim EventThe simulator will apuse and give control to Specman Elite when it sees change in a signmal in an @sim event. event clock_e is rise(â~@~X~/top/clkâ~@~Y)@sim;


Index
Introduction
E Basics
Data Types
Operators
Struct
Units
List
Methods
Concurrency Actions
Constraints
Extend
When And Like
Events
Temporal Expressions
Temporal Operators 1
Temporal Operators 2
Synchronizing With The Simulator
Wait And Sync
Physical Virual Feilds
Packing N Unpacking
Pre Run N On The Fly
Coverage
Commands
Extendable Methods
Non Extendable Methods
And Gate Evc

Report a Bug or Comment on This section - Your input is what keeps Testbench.in improving with time!





<< PREVIOUS PAGE

TOP

NEXT PAGE >>

copyright © 2007-2017 :: all rights reserved www.testbench.in::Disclaimer